Coyote Was Going There
On the 17th of February we continued with our professional project by filming the third year acting and costume design production of “Coyote Was Going There” We had to arrive at 10 O’clock so we could get everything set up in time to film the main show which was at 7 O’clock, we also wanted to watch the final dress rehearsal and get a wide shot of it in case we needed any extra footage. We got everything set up by 12:30 so once we’d made sure everything was fine we had an hour and a half to kill until the start of the dress rehearsal.
Since we’d decided we were only going to get the wide shot of the dress rehearsal we didn’t need to do much, so we pressed record on the camera and sat down to watch the production. We figured this would give us a chance to see what we were dealing with and get an idea of the shots we needed. This turned out to be a good idea because when we came to film the main show we were dealing with.
The main show started at 7:00 and we were all in place to film. from what i can tell we got some really good footage and really built on our great experience from last year. All in all it as a really good day. Now all we need to do is get everything edited.
No trackbacks yet.